STORMWATER MANAGEMENT

Drainage amplification aims to limit the occurrence of flooding to an acceptable level of severity and frequency. Works normally include the construction of new stormwater drainage pipelines and pits or the reconstruction of existing stormwater drainage pipelines and pits.
 
Drainage amplification work is generally carried out in areas where flooding problems have been brought to the attention of Auburn City Council and Council has investigated the cause, assessed the frequency and severity and has costed and prioritised the required remedial work. This work is sometimes carried out in conjunction with road reconstruction work.  

Criteria for drainage amplification work

The prioritisation of the drainage amplification work is based on the severity of flooding. For example, is the flooding:
  • Confined to road pavement
  • Confined to road pavement and footpath
  • Flooding private property below habitable floor levels
  • Flooding private property above habitable floor levels
  • A health hazard
  • Damaging property
  • A danger to life

Stormwater: Key Documents

  
  
  
Auburn City Council Rainfall Intensities.pdfAuburn City Council Rainfall Intensities37 KB
Cooks River Stormwater Management Plan.pdfCooks River Stormwater Management Plan6785 KB
Duck River and Duck Creek Flood Study Review Report.PDFDuck River and Duck Creek Flood Study Review Report29282 KB
Duck River Catchment - Draft Floodplain Risk Management Plan.pdfDuck River Catchment - Draft Floodplain Risk Management Plan13852 KB
Duck River Catchment - Floodplain Risk Management Study.pdfDuck River Catchment - Floodplain Risk Management Study1140 KB
Duck River Stormwater Management Plan - July 1999(2).pdfDuck River Stormwater Management Plan - July 1999(2)15741 KB
Haslams Creek Floodplain Management Study - Final report January 2003.pdfHaslams Creek Floodplain Management Study - Final report January 20034526 KB
Homebush Bay Catchment Stormwater Management Plans Final Report JULY1999.pdfHomebush Bay Catchment Stormwater Management Plans Final Report JULY19995125 KB
Lower Parramatta River Floodplain Risk Management Study.pdfLower Parramatta River Floodplain Risk Management Study12189 KB
On Site Detention Calculation Sheet.pdfOn Site Detention Calculation Sheet88 KB
On Site Detention Certificate of Hydraulic Compliance (Outstanding Works).pdfOn Site Detention Certificate of Hydraulic Compliance (Outstanding Works)55 KB
On Site Detention Certificate of Hydraulic Compliance.pdfOn Site Detention Certificate of Hydraulic Compliance53 KB
On Site Detention Drawing Submission Checklist.pdfOn Site Detention Drawing Submission Checklist224 KB
On Site Detention WAE Survey and Certification Submission.pdfOn Site Detention WAE Survey and Certification Submission184 KB
Section 88B Instrument Wording.pdfSection 88B Instrument Wording92 KB