STORMWATER MANAGEMENT

Drainage amplification aims to limit the occurrence of flooding to an acceptable level of severity and frequency. Works normally include the construction of new stormwater drainage pipelines and pits or the reconstruction of existing stormwater drainage pipelines and pits.
 
Drainage amplification work is generally carried out in areas where flooding problems have been brought to the attention of Auburn City Council and Council has investigated the cause, assessed the frequency and severity and has costed and prioritised the required remedial work. This work is sometimes carried out in conjunction with road reconstruction work.
 

Criteria for drainage amplification work

The prioritisation of the drainage amplification work is based on the severity of flooding. For example, is the flooding:
  • Confined to road pavement
  • Confined to road pavement and footpath
  • Flooding private property below habitable floor levels
  • Flooding private property above habitable floor levels
  • A health hazard
  • Damaging property
  • A danger to life

Stormwater: Key Documents

  
  
Auburn City Council Rainfall Intensities.pdfAuburn City Council Rainfall Intensities
Cooks River Stormwater Management Plan.pdfCooks River Stormwater Management Plan
Duck River Stormwater Management Plan - July 1999(2).pdfDuck River Stormwater Management Plan - July 1999(2)
Haslams Creek Floodplain Management Study - Final report January 2003.pdfHaslams Creek Floodplain Management Study - Final report January 2003
Homebush Bay Catchment Stormwater Management Plans Final Report JULY1999.pdfHomebush Bay Catchment Stormwater Management Plans Final Report JULY1999
On Site Detention Drawing Submission Checklist.pdfOn Site Detention Drawing Submission Checklist
OSD Calculation Sheet.pdfOSD Calculation Sheet
OSD Certificate of Hydraulic Compliance (Outstanding Works).pdfOSD Certificate of Hydraulic Compliance (Outstanding Works)
OSD Certificate of Hydraulic Compliance.pdfOSD Certificate of Hydraulic Compliance
OSD WAE Survey and Certification Submission.pdfOSD WAE Survey and Certification Submission
Section 88B Instrument Wording.pdfSection 88B Instrument Wording